Sunday, February 26, 2012

STUDIO WATCH




I just finished setting up materials and the interior entrance atrium in a way that I liked. Here's a rendering.


Here's a rendering of the 2nd floor interior. Lighting has not been set up yet.
 Here's a section rendering of the interior areas where the ceiling meets the floor.

Friday, February 24, 2012

Studio Watch

I'm doing PV panels in the curtain wall system, everything will shade the area, then the glass may be tinted as well. This rendering demonstrates the opacity possibility of the curtain wall. I was thinking I'd only have vertical exterior aluminum mullions, then a flush horizontal system to really emphasize the verticality of the project. Here seen in another rendering, I've experimented with the glass color as seen here.


Thursday, February 23, 2012

Friday, February 17, 2012

CRANBERRY WATCH

I dreamt about cranberries one night. It was brilliant.

Monday, February 13, 2012