Monday, March 12, 2012

FINAL WATCH

Third floor atrium

Tuesday, March 6, 2012

SECTION WATCH





Roof/wall section

Monday, March 5, 2012

OCEAN SPRAY WATCH

So I contacted the GDIs at Ocean Spray, asking for free swag. I got an email back "BLAH BLAH BLAH BS No hats or shirts." So Here's to nothing.
Add caption

Sunday, March 4, 2012

STUDIO WATCH




Site Rendering



First Floor in progress.

Second floor in progress.

Third floor in progress.
Here are the floor plans I've been working on. My previous attempt to upload them was met with a file size that was deemed TOO LARGE for Blogger. These have since been updated and finessed... of course.


Rendered Site plan of my building connecting to the main road. Invisible Trees
Here are the/ye old(e) ones.

Old 1st floor

Old 2nd floor
Old 3rd floor

RENDER WATCH



















Exterior rendering with site from the south at an altitude of 500ft AGL in a Bell 206B Jetranger III.... in Revit

Friday, March 2, 2012

STUDIO WATCH

Here's a high quality rendering of the interior with a ceiling, im considering this to be done.



Second floor atrium with metal panel ceiling


Post Script
Blogger does horrid things with image quality.